• 您的网站试用资格已过期。

Shenzhen CentRoyal Metal & Plastic Co., Ltd

Quality Control

We get ISO9000 certification for more than 10 years. We have incoming inspection, in-process inspection and final inspection. We will issue a

professional inspection report for each shipment after we do inspection.


Pre-production sample sign-off.

Goal: Set-up quality standard for mass production

Check: material, spec, structure, finish, function, safety


In-line inspection(earlier stage)

Check:

1.  Incoming material & spec

2.  Component shape & dimension

3.  Packing method


In-line inspection(post-finished)

Check:

1. Finishing process (color, smoothness, durability)

2. Printing process (logo color, text, font, size ,graphic content & color )

3. Assembly make sure all components match well with each other


Final inspection

Goal: Check average quality lever of the shipment

1.    Randomly pick up sample from packed goods as per AQL Major 1.5Minor 4.0 standard

2.  Issue formal inspection report, take detailed inspection photos for records

HOME
CENTROYAL

F-A-Q

CONTACTS

Lynn Lee

phone:180 2875 3659

tel:86-755-8921 5779

E-mail:lynnlee@popdisplaycr.com

Add:905, China South Development Center,

Pinghu, Longgang, Shenzhen,518111 China.

Quality Control